City of Hartsville PERMIT FEE SCHEDULE

(effective August 15, 2001)

Plan Review.  When the valuation of the proposed construction exceeds $1000.00 and a plan is required to be submitted by the Building Official, a plan checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking.  The plan checking fee shall be equal to one half of the building permit fee as shown in this fee schedule.  The plan checking fee is in addition to the building permit fee.

Penalties.  Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits and licenses shall have the permit fee doubled.

 

(1) Determination of Total Valuation.  For purposes of determining fees under the provisions of Article I, Section 10-4., total valuation shall be the greater of the actual contract price or an applicable amount based on the total square footage of the structure to be built multiplied times the square foot cost data prescribed on the Building Valuation Data Table.

Scroll down for Frequently Asked Questions

Back to  Permits page.          Back to Codes Enforcement Page

 

Click here to read the Permit Holder Responsibility.

Choose either Residential Building Permit or Commercial Building Permit

Type of Permit

Total Valuation (1)

Fees

Building - Repair

$10 to $200

No permit required.

 

$201 to $1000

$25.00

 

$1,001 to $50,000

$25.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.

 

$50,001 to $100,000

$260.00 for the first $50,000 plus $4.00 for each additional thousand or fraction thereof, to and including $100,000.

 

$100,001 to $500,000

$460.00 for the first $100,000 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000

 

$500,001 and up

$1660.00 for the first $500,000, plus $2.00 for each additional thousand or fraction thereof.

Electrical

$25.00 for the permit and $10.00 per $1,000 in total valuation or fraction thereof

Plumbing

$25.00 for the permit and $10.00 per $1,000 in total valuation or fraction thereof

Mechanical

$25.00 for the permit and $10.00 per $1,000 in total valuation or fraction thereof

Gas

$25.00 for the permit and $10.00 per $1,000 in total valuation or fraction thereof

Demolition Fee

$60.00